Skip to content
approved Visibility internal Owner erik@uvilo.com Approver _ Created 2026-07-17 Updated 2026-07-17

Life Circumstances Vision Eval 1

Evaluation of Vision for Plan cycle 1.


Phase

Vision_Eval

Run Context

FieldValue
Date2026-07-17
DepartmentProduct
ProjectProduct/Life_Circumstances
Evaluator roleProject Evaluator
Skillproject-vision-eval
Phase at startVision_Eval_Started
Vision reviewedProduct/Projects/Life_Circumstances/Life_Circumstances_Vision.md
Existing eval reportNone found before this run
Independence checkPassed — this evaluation session did not author the Vision document

Verdict

Approved

Checklist

#CheckStatusNotes
1ClarityRequirements are stated in direct, domain-specific language. Field metadata, storage model, categories, conditional domain triggers, contextualization, JSON output, privacy, update process, and security safeguards are understandable without requiring author clarification.
2TestabilityEach requirement maps to inspectable outputs or demonstrations: JSON schema contents, category definitions, storage constraints, trigger mappings, contextualization rules, sensitivity classifications, skill documentation, and security review checkpoint.
3Non-contradictionRequirements and scope boundaries are consistent. The Vision distinguishes schema definition from out-of-scope runtime infrastructure, UI, quiz authoring, analytics dashboards, and analysis bot implementation.
4CompletenessThe stated scope is covered by requirements for canonical schema promotion, storage model, categories, conditional applicability, scoring contextualization, machine-readable output, privacy handling, update workflow, and security safeguards.
5Charter considerationsStewardship, Privacy, and Security are relevant and explicitly addressed through R1, R7, and R9. Performance tracking is not materially applicable because this project defines data/schema methodology rather than agent execution, automation runtime, or infrastructure cost tracking.

Findings Summary

No blocking or conditional findings were identified.

Resolution Log

No findings required resolution. Auto-fix loop was not invoked.

Run / Cost Evidence

Exact token and cost data for this evaluation run is unavailable in the tool output. Available evidence: evaluation was performed on 2026-07-17 in this conversation using the project-vision-eval skill; reviewed files were limited to the phase file, Vision document, absence of an existing Vision Eval report, and the required Vision Eval template. Build, git, and push results are recorded in repository history for the final commit.

Next Step

Set Life_Circumstances_Phase.md to Phase: Vision_Eval_Completed. Because the phase has no configured human gate, the next autonomous routing step is Research by the Project Thinker.