| C1 | Self-contained | ✅ | Each task quotes the relevant Spec section and provides sufficient context for an implementing agent to proceed without consulting Vision, Research, or Spec. Task 1 quotes §7 and lists all 5 items to delete. Task 2 quotes §3. Task 3 quotes §2 and specifies each file plus topics to cover. Task 4 quotes §4, §5, §6 and lists per-skill changes. Task 5 quotes §8 and gives exact grep commands. |
| C2 | Procedural, not declarative | 🟡 | Tasks 1, 2, 4, and 5 are procedural with step-by-step instructions. Task 3’s subtasks are partially declarative — they describe the target state (“Rewrite it to describe deploying uvilo-mono…”) rather than procedural edit steps. For large rewrites like Forge_Setup.md (~35KB), the Plan should prescribe a procedure: e.g., “1. Read current file, 2. Identify all LibreChat-referencing sections, 3. Replace section X with content covering Y, 4. Delete section Z.” The current topic-list approach leaves the implementing agent to determine the edit strategy. |
| C3 | Single session | 🔴 | Plan 1 contains far too much work for one focused agent session. It requires: deleting 5 files/directories + sidebar updates (Task 1), archiving MongoDB + sidebar updates (Task 2), rewriting 6 knowledge files including a ~35KB document (Task 3 with 6 subtasks), updating 8 skills (Task 4 with 8 subtasks), and verification (Task 5). This is 3–4 sessions of work minimum. The Plan should be split into at least 2–3 Plans — e.g., Plan 1: Tasks 1–2 (deletions and archival), Plan 2: Task 3 (knowledge file rewrites), Plan 3: Tasks 4–5 (skill updates and verification). |
| C4 | Spec coverage | 🟡 | All Spec sections are addressed except §1 (Migration Success Criteria Verified). The Spec states this “does not require ongoing maintenance” and the Research document already verified V0–V5, so no action task is needed. However, the Plan should explicitly acknowledge §1 is satisfied by Research to close the loop. §2→Task 3, §3→Task 2, §4→Task 4, §5→Task 4 intro, §6→Task 4 intro, §7→Task 1, §8→Task 5. |
| C5 | No gaps or overlaps | ✅ | No redundant work between tasks. Each task targets distinct files/directories. No missing work — all Spec sections have corresponding tasks (§1除外, noted above). Out-of-scope skills (Vercel_MCP, Linear_MCP, Suprsend_MCP) are correctly excluded per Spec §4. |
| C6 | Ordered | ✅ | Task sequence respects dependencies: deletions first (Task 1), then archival (Task 2), then knowledge updates (Task 3), then skill updates (Task 4), then verification (Task 5). No forward references. Task 5 correctly depends on all prior tasks being complete. |
| C7 | Task quality | 🟡 | Every task has a context quote block referencing the Spec section ✅. Tasks 1, 2, 4, 5 have actionable, specific steps ✅. Task 3’s subtasks have specific file targets and topic lists but lack procedural edit instructions — they describe what the output should look like rather than how to produce it step by step. For example, Subtask 3.2 says “Rewrite it to describe deploying uvilo-mono (bot-craft) on Railway” with a topic list, but doesn’t specify which sections to replace, which to delete, or the order of edits. |
| C8 | No checkboxes | ✅ | The Plan uses numbered lists throughout. No checkboxes present. |
| C9 | Planning scope rule | ✅ | The Plan prescribes edits only to repo content within the project’s scope: obsolete files (delete), MongoDB skill (archive), knowledge files (rewrite), skill files (update), and sidebar config. No edits prescribed to other Plans, out-of-scope documents, or project meta-documents. |
| C10 | Testable output | ✅ | Each task includes “build to verify, then commit and push” for incremental verification. Task 5 provides the definitive test: grep -ri "librechat" returns zero hits on published files. Since this is the only Plan, the “before later Plans” aspect is moot, but the output is fully testable. |