Skip to content
archived Visibility internal Owner erik@uvilo.com Approver _ Created 2026-06-26 Updated 2026-06-26

Forge Project Cleanup Spec Eval

Evaluation of Spec for Forge_Project_Cleanup.


Evaluation Context

FieldValue
PhaseSpec_Eval
Run date2026-06-26
Agent / sessionProject Evaluator, fresh independent review session
DepartmentForge
ProjectForge_Project_Cleanup
VisionForge/Projects/Forge_Project_Cleanup/Forge_Project_Cleanup_Vision.md
ResearchForge/Projects/Forge_Project_Cleanup/Forge_Project_Cleanup_Research.md
SpecForge/Projects/Forge_Project_Cleanup/Forge_Project_Cleanup_Spec.md
Skillproject-spec-eval
Auto-fix round1
Thinker fix commit125399ef7e1e2ba312cf44f2d1ff1535497b77f8

Verdict

Approved.

Checklist

#Checklist ItemResultNote
1Every requirement addressedR1-R9 are all mapped in the Requirement Traceability table and have substantive Spec sections.
2No orphan sectionsSections trace to Vision requirements or approved Research correction constraints.
3DeclarativeThe Spec describes target state, behaviors, guarantees, inventories, and evidence rather than implementation steps.
4Self-containedThe Spec now defines both the filesystem-safe {ProjectSlug} path convention and the exact human_gates storage schema in Phase-file frontmatter.
5No internal contradictionsThe canonical project identifier {Department}/{ProjectShortName} is distinct from the filesystem-safe {ProjectSlug}, resolving the slash/path contradiction.
6Research decisions reflectedThe five approved Research correction constraints are reflected: todos, WIP removal, work-product communication, handoff/phase ownership, and Charter controls.
7Success criteria achievableV8 and V9 are achievable after the Spec clarifies filesystem-safe naming and human gate persistence.
8Naming consistentCanonical/display identifiers, {ProjectShortName}, and {ProjectSlug} are defined and used consistently.
9Exact content preservedNo Research or Vision prompt/config/message exact text requiring References/ preservation is paraphrased as implementation content.
10No hidden scopeHuman gate persistence is explicit: human_gates is a top-level YAML frontmatter list in the existing Phase file.

Items

#TypeDescriptionStatusDisposition
E1DefectSection 11 made the department-qualified project identifier {Department}/{ProjectShortName} apply to project folder names and work-product file names. Since / is a path separator, this was internally inconsistent and left implementers without a filesystem-safe naming rule.🟢 ResolvedFix
E2GapSection 12 said human gate selections were recorded in “the project Phase file or a dedicated configuration section,” leaving a hidden implementation choice and ambiguous target configuration shape.🟢 ResolvedFix

Disposition values: Fix | Update spec | Reject | Defer to future cycle | Change requested by user

Status values: 🔴 Open | 🟡 In progress | 🟢 Resolved

Resolution Log

#DispositionAction takenResolved
E1FixProject Thinker added a canonical/display identifier vs filesystem-safe {ProjectSlug} distinction and clarified path/file-name usage.Yes
E2FixProject Thinker selected the existing Phase file as the storage location and defined human_gates as a top-level YAML frontmatter list with exact gate values and defaults.Yes

Build / Commit Evidence

StepEvidence
Initial Spec Eval report and sidebarReport committed in eb9ec55; sidebar committed in f46e620; build passed in Page Manager run.
Auto-fixSpec fix committed and pushed in 125399ef7e1e2ba312cf44f2d1ff1535497b77f8; build passed with cd .internal && pnpm run build.
Final evaluator updateFinal report and phase completion built, committed, and pushed after this report update.

Next-Step Instruction

Set Phase: Spec_Eval_Completed. The Spec is approved for the next autonomous phase, Plan, subject to normal Runner routing and any configured human gate behavior.