Skip to content
approved Visibility internal Owner erik@uvilo.com Approver _ Created 2026-07-21 Updated 2026-07-21

Knowledge Consistency Execute Eval 4

Evaluation of Plan 4 implementation for Forge/Knowledge_Consistency.


Run — 2026-07-21

Phase

Execute_Eval_4

Agent / Session Context

FieldValue
DepartmentForge
ProjectKnowledge_Consistency
Responsible bot / roleforge/project-evaluator (Project Evaluator)
SkillProject_Execute_Eval
Plan evaluatedPlan 4 — Knowledge File Frontmatter Corrections
Evaluation sessionFresh evaluator session, separate from the Execute session
Prior phase gateConfirmed Phase: Execute_4_Completed before evaluation; evaluator set Phase: Execute_Eval_4_Started in commit 2163e60

Verdict

Approved after auto-fix convergence.

Implementation Summary

TaskStatusNotes
Task 1 — Change status: approved to status: published✅ PassAll 6 target files have status: published; none have status: approved.
Task 2 — Remove frontmatter date fields✅ PassAll 16 target files have no created, updated, or lastUpdated fields in YAML frontmatter. Body examples containing lastUpdated: were not treated as frontmatter.
Task 3 — Add missing approver field✅ PassAll 5 target files have approver in YAML frontmatter.
Task 4 — Add complete frontmatter to Forge/Forge_Project/AGENTS.md✅ PassFile has title, visibility, status, owner, and approver.
Task 5 — Build, commit, and push✅ Pass with expected build variancenpm run build from repo root fails because the root package has no build script; this is the known Plan condition. Plan 4 execution commits were pushed, and evaluator auto-fix commit 7439007 was pushed.

Changelog / Changed-File Checklist

CheckStatusEvidence
Changelog Plan 4 rows align with planned knowledge-file scope✅ PassChangelog lists the 16 target knowledge files plus Plan 4 state/phase work-products.
Git changed-file review found no remaining unexpected implementation artifact changes✅ PassAfter auto-fix, each of the 16 Plan target files differs from the pre-Plan-4 base only in YAML frontmatter.
Sidebar/admin changes✅ PassThe primary execution commit included the expected sidebar update for the newly added Execute State page. This was administrative, not a knowledge-content defect.

Items

#TypeDescriptionStatusDisposition
E1DefectForge/Forge_Setup.md had unexpected body-only deletions in the Plan 4 implementation: 107 lines were removed outside YAML frontmatter, including blank lines and Markdown code-fence markers. Plan 4 scope was frontmatter-only, so the body changes did not align with Plan intent.🟢 ResolvedFix — Auto-dispositioned

Resolution Log

#DispositionAction takenResolved
E1Fix — Auto-dispositionedRestored Forge/Forge_Setup.md body from the pre-Plan-4 version while preserving the corrected current frontmatter (status: published, approver: ""). Re-ran changed-file/body comparison and frontmatter checks. Committed and pushed fix as 7439007 (Auto-fix Plan 4 Forge Setup body restoration).Yes

Verification Evidence

EvidenceResult
Frontmatter validation script over all 16 Plan target filesPASS: Plan 4 frontmatter criteria satisfied for all 16 files; no duplicate keys found.
Body comparison against pre-Plan-4 base for all 16 target filesPASS: all 16 bodies match the pre-Plan-4 base after auto-fix; only frontmatter differs.
git diff --numstat b130bef^ -- [16 target files] after auto-fixConfirms frontmatter-sized deltas only; Forge/Forge_Setup.md reduced to 2 insertions / 1 deletion.
npm run build from repo rootExpected failure: npm error Missing script: "build".
Commit / push evidencePlan 4 commits reviewed: b130bef, 2756312, e78854e, 4fc1957, c93f769; evaluator start commit 2163e60; routing/log commit 52f379a; evaluator auto-fix commit 7439007; report/sidebar commit 3d8b877; completion status commit f9368c2. Local dev and origin/dev were aligned after pushes.

Work-Product Communication Check

Pass. The material evaluation finding and its auto-fix disposition are recorded in this durable report. No user decision is required for E1 because the issue was mechanical, unambiguous, and resolved by the evaluator auto-fix loop.

Run / Cost Evidence

Exact token/cost accounting is unavailable to this evaluator session. Available run evidence consists of the persisted report, reviewed commit hashes, command results recorded above, Page Manager job cnv_cmrvb2hp0003v01r21msxy3qz, and pushed git commits 2163e60, 52f379a, 7439007, 3d8b877, and f9368c2.

Next Step

Plan 4 and Execute State 4 frontmatter were set to status: approved, the phase was set to Execute_Eval_4_Completed, and Execute_Eval is not listed in human_gates. Route autonomously to Execute Plan 5.